Objective and Challenge
Legionella is a major health problem in facilities having large water systems where areas of the water system are not always in use such as wells in autumn season. The unused water can result in the build-up of Legionella or other health endangering bacteria within the water system.
Engineering Process
- Identifying, Analyzing and Installing High Productivity Equipment and Machines
- Identifying, Analyzing and Utilizing High Productivity Special Processes
- Developing special purpose machines
- Installing accessories for productivity improvement
- Using Jigs and Fixtures
- Using more productive tools
- Using new lubricants
- Using new cutting fluids
- Cutting parameters optimization
- Process parameters optimization
- SMED
- Machine Work Study
- Operation Analysis
- Process Analysis
- Electric power consumption analysis and reduction
- Predictive maintenance
- Preventive maintenance
- OEE improvement
Result Driven
Our engineers help you avoid risk while staying focused on quality, efficiency and cost-savings. From simple to complex manufacturing decisions, our staff is trained to find solutions and help you be informed. By providing these services, we help our customers mitigate risk and ensure quality and delivery objectives are maintained. Our mission is to be an invaluable resource for your manufacturing and assembly needs.